Lircay

Complete electrical balance of plant and High Voltage substation. The project received the INFRASTRUCTURE 100 award for the best 100 infrastructures in the world of 2010.

  • Business area:

    Hydropower

  • Activities:

    Engineering & Construction

  • Power KW:

    21.400

  • Area:

    LATAM

  • Country:

    Chile

  • Principal Characteristics:

    Medium Hydro Power Plant equipped with 2×10700 kW Francis Turbines

  • Type of contract:

    Balance of Plant Contractor