STE Energy signed a contract for the full revamping of 3 hydropower plants (30 MW) automation and control system in Panama. The project, in addition to the modernization of the control and supervision system of production plants, also includes the preparation of an advanced centralized control room allowing the remote management of assets and two-way communication with the national dispatch center, through the STE Guardian software.