STE at work in the heart of the European electrical grid.

A contract for the design and supply of the electrical protection system for a Phase Shifting Transformer to be installed on the border among Germany, Luxembourg and France has been signed. This special transformer will increase the controllability of the active power flow, improving the exploitation of the existing electricity infrastructure and avoiding overload outages in such an important node of the European interconnected transmission system.

 

#steenergy #highvoltage #electricalsubstation #services #digitalsolutions

Discover more:

Proud to share that we have successfully energized a 150/30 kV electrical substation in Lazio Region

A huge thank you to everyone involved for their hard work and dedication!


Even in this tough period, STE Energy does not stop!

Connected from our office in Italy, we successfully and safely achieved the remote training and factory testing of multiplexer and teleprotections for the HV substation of "Campos…


STE Energy continues to work despite Coronavirus!

A contract for electromechanical supplies for a new hydroelectric plant under construction in Piemonte has been signed. The new system, which involves the installation of a VLH…


Join our mailing list!

Register to receive e-mail updates on new projects carried out,
participation in fairs and much more on the topics of renewable energy and electricity infrastructure.

come to meet us

STE Energy S.r.l.

Registered Office: Viale Galbani 70
00156 Roma, (IT)
Operational Headquarters: Via Sorio 120
35141 Padova (PD), (IT)

Share Capital: € 2,000,000.00 fully paid
VAT Number: 05252420285