Ariano Irpino

Full EPC contract for step-up and interconnection substations of a wind farm – 150 kV.

  • Business area:

    High Voltage Systems

  • Activities:

    Engineering & Construction

  • Voltage:

    150

  • Area:

    EUROPE

  • Country:

    Italy

  • Principal Characteristics:

    Air Insulated Substations – 220 kV – 5 Bays – step-up and interconnection substations.

  • Type of contract:

    EPC Contractor