Campos del Sol

Full EPC contract for step-up and interconnection HV substations and HV overhead transmission line for the biggest solar plant in Chile – 220 kV.

  • Business area:

    High Voltage Systems

  • Activities:

    Engineering & Construction

  • Voltage:

    220

  • Area:

    LATAM

  • Country:

    Chile

  • Principal Characteristics:

    Air Insulated Substations and overhead transmission line – 220 kV – step-up and interconnection substations

  • Type of contract:

    EPC Contractor

  • come to meet us

    STE Energy S.r.l.

    Head Office: Via Sorio 120
    35141 Padova (PD), Italia

    Share Capital: € 2,000,000.00 fully paid
    VAT Number: 05252420285