El Arenal

Complete balance of plant for a Large Hydro including the turn-key supply of small hydroelectric power plant (1MW Francis) installed on the discharge.

  • Business area:

    Hydropower

  • Activities:

    Engineering & Construction

  • Power KW:

    80.000

  • Area:

    LATAM

  • Country:

    Honduras

  • Principal Characteristics:

    Large Hydro Power Plant equipped with 2×30700 kW Francis Turbines

  • Type of contract:

    Balance of Plant Contractor

  • Join our mailing list!

    Register to receive e-mail updates on new projects carried out,
    participation in fairs and much more on the topics of renewable energy and electricity infrastructure.

    come to meet us